» Pre-Qualified Contractors List PCCA Expansion Bid InformationJuly 21, 2008 The Buckley Walsh JV will be hosting Outreach Meetings on the following dates:
New Bid Extension Date: AUGUST 15, 2008
July 10, 2008 / Project Updates The PCCA has awarded Contract # 1 to the Keating JV as the lowest responsible bidder. Bid Package #2 documents are available in the same locations as the first bid package. Please refer to June 24, 2008. Pre-qualified Contractors and M/W/BE Contact Numbers (Bid Package # 2)
June 27, 2008/ Project Updates The Community Outreach and the Mandatory Pre Bid meetings for Bid Package # 2 have been rescheduled for July 9th in room 108. The Community Outreach Meeting will start promptly at 9:00am and the Pre Bid will follow at 10:30am. Support Services will be available for these meetings, and the opportunity for a site tour. PENNSYLVANIA CONVENTION CENTER AUTHORITY INVITATION TO BID Notice is hereby given that the Pennsylvania Convention Center Authority, (the “Authority”) is soliciting Bids from General Contractors for Contract 2 – General Construction. Bid Documents are available as of June 23, 2008. The Scope of Work shall include the General Construction portion of the project including the exterior facade and curtain wall systems, interior fit-out, vertical transportation, and all mechanical, electrical, plumbing, and fire protection systems of the new 935,000 sq. ft expansion and an 30,000 approximate square feet renovation to the existing Pennsylvania Convention Center. Contractors submitting a bid on the Project must provide a qualification statement at time of Bid.
upon the non-refundable payment of five hundred dollars ($500.00) per set in the form of a check made payable to The Pennsylvania Convention Center Authority.
If an award is made as a result of this invitation to Bid, the Authority will award the General Construction Contract 2 work to the responsive bidder submitting the lowest responsive bid, as determined in the sole discretion of the Authority. Not withstanding the foregoing, the Authority reserves the right to reject any and all bids if the Authority determines that doing so would be in the best interest of the Authority Bid Documents are placed on file and may be examined between the hours of 8:30 AM and 4:00 PM (EST) at:
June 24, 2008 The Pennsylvania Convention Center Expansion is officially underway. Bid package # 1 is being reviewed and the presumptive low bidder will be announced shortly . The demolition and site preparation activities are drawing to a close. The construction managers have released bid documents #2, to pre-qualified general contractors. The outreach meeting for bid package # 2, will be Friday June 27, 2008 at 9:00am at the Pennsylvania Convention Center, Room 108B, 12th and Arch Streets, Philadelphia, PA 19107 (west entrance). The contractors will be to available meet with you one on one following the presentation. You will also have an opportunity to meet one on one with organizations that provide technical assistance, financing, bonding and safety.
The scope of work for this phase of the Expansion Project includes but is not limited to, the selective demolition, architectural precast concrete, brick and CMU masonry, structural curtain wall systems, aluminum, metal siding and roofing. Exterior Work also includes replacing curbs, sidewalks, and street surfaces, hard and soft landscaping. Interior construction consists of CMU masonry, metal framing systems, operable partition systems, and various finish systems. Mechanical, Plumbing and Fire Protection, Electrical, Fire Alarm, Communication, Way Finding (signage), Security, and Data systems, also included is a storm water detention system. At the conclusion of the Outreach Meeting, a site tour has been scheduled. Please RSVP to Bari Irvin at 215.851.1829 no later than Wednesday June 25, 2008. Project drawings have been released and will be available for review at the following locations: Mid Atlantic BX By appointment only at: Greater Philadelphia Urban Affairs Coalition To make an appointment please contact Bari Irvin at:
May 15, 2008
May 6, 2008
Pre-qualified contractors/DBE Compliance
Officers
1.
AP Construction – Gina Petrongolo 215.922.2323 2.
Bedwell Company – Keith Bedwell 610.399.1610 3.
Conti Enterprises, Inc. – Pat Hogan
215.757.0979 4.
Daniel J. Keating Co.* – Joseph J. Maloney
610.664.4550 5.
Hunter Roberts Construction Group – Tony Fable
215.832.4300 6.
Walsh Construction* – Doug Cunningham
312.563.5402 .
2. Mid Atlantic BX
3. Greater
To make an appointment please contact Bari Irvin at: April 3, 2008 GPUAC Community
Outreach Meeting April 7, 2008 Mandatory Pre-bid
Meeting (Bid package # 1 & # 1a) April 18, 2008 Hunter Roberts
Outreach Meeting Walsh/Buckley Outreach
Meeting April 23, 2008 Daniel J.
Keating/Keating Building Outreach Meeting Bedwell Company Outreach Meeting Pre-qualified
Contractors Site Tour April 29, 2008 All bidders
Site Tour May 6, 2008 (Original
date) ·
Bids due ·
3 Addendums have been issued on Bid
Package # 1. Please contact pre-qualified contractors for information. ·
There was discussion at the 4/3
Community Outreach Meeting about certain subcontractor bonding requirements that were not found in the
Contract Documents.
Please
clarify: Answer: The Contract Documents do not reference
sub- contractor bonding. CONTRACTOR MAY BOND SUBCONTRACTORS AT
ITS DISCRETION May 14, 2008 BID DATE EXTENTION |